| 1 | At the time of Booking | 10% |
| 2 | At the execution of Agreement | 10% |
| 3 | On commencement of RAFT foundation | 10% |
| 4 | On or before laying of Basement floor slab | 5% |
| 5 | UG Parking floor slab | 5% |
| 6 | 2nd residential floor slab | 5% |
| 7 | 4th residential floor slab | 5% |
| 8 | 6th residential floor slab | 5% |
| 9 | 8th residential floor slab | 5% |
| 10 | 10th residential floor slab | 5% |
| 11 | 12th residential floor slab | 5% |
| 12 | Top floor slab | 5% |
| 13 | Internal plaster within the flat | 5% |
| 14 | Internal tiling work commencement | 5% |
| 15 | Interior painting work | 5% |
| 16 | External facade painting | 5% |
|
Total |
100% |